ESE S

Stationary extraction technology with a system

The ESE S is a powerful, stationary extraction system for industrial applications, tunnel construction, recycling companies and other applications with permanent or frequent extraction requirements. Robustly built and individually configurable – for reliable performance in continuous operation.

  • Permanent suction power for stationary applications
  • Powerful fan unit
  • Large material intake due to variable container sizes
  • Maintenance-friendly design
  • Individual integration into existing processes

The fan

  • Continuous operation due to industrial design
  • Optionally as single, double, triple or quadruple fan
  • High conveying capacity even with heavy materials
  • Low wear – long service life
  • Easy maintenance

The material module

  • Upstream filter module enables dust-free operation
  • Material discharge directly into BigBag systems or bulk material containers
  • Optional ejection via conveyor belt

Filter module

Material module

The articulated hose carrier

  • Up to 352° degree movement radius with the optional swivel joint
  • Better access to concealed areas on the construction site
  • Lower number of realignments necessary

Application

Continuous suction power for industrial processes

Whether in tunnel construction, bulk material loading or in recycling plants – the ESE S ensures continuous material intake and safe discharge of suction material. Thanks to its modular concept, the system can be adapted precisely to your operation.

  • Ideal for tunnel, silo, port or factory operation
  • Integration into existing material flows
  • Operation possible around the clock

Track renovation at Deutsche Bahn

Efficient track conversion with stationary ESE S system

An ESE S was used as a stationary extraction system for mechanical track renovation at Deutsche Bahn. The system ensures reliable extraction of the removal material directly on site and is integrated into an automated material flow.

  • Location: Refurbishment of the Berlin S-Bahn network
  • Task: Extraction of track ballast and construction materials

Technical data

Note: The technical data given corresponds to the example model shown here. Individual values may vary depending on customer requirements and equipment. Please contact us for a configuration tailored to your project.

Your contact person

Please use our contact form. Our sales team will get back to you promptly to answer your questions and prepare a customized offer.